Click here to show project info
The challenge of this landmark project was to find an architectural language that would relate to the existing structure while introducing a new contemporary touch without creating a rupture with the past.
The newly added office spaces consist of a steel and glass volume that embraces the existing Chamber. The scheme reads as if the two structures have always coexisted together.
Location Tripoli, Lebanon
Date 2005
Status Complete
Site Area 4,500 m2
Built-Up Area 21,000 m2